Greenfield Data Center – Phase 1
New 20MW data center facility with redundant power, advanced cooling systems, and raised-floor server rooms.
Statement of Work
Greenfield Data Center – Phase 1 - Statement of Work.pdf
application/pdf
Extracted Scope Items (8)
Site & Civil
Grading, stormwater management, access roads, and security fencing.
Building Shell
Pre-engineered metal building with concrete tilt-up panels for server halls.
Electrical – Utility & Switchgear
Dual utility feeds, 20MW switchgear, transformers, and ATS systems.
Backup Power
N+1 diesel generator farm with 48-hour fuel storage.
Cooling Systems
Chilled water plant with economizer mode, CRAHs, and hot/cold aisle containment.
Raised Floor & Cabling
24-inch raised floor system with underfloor cable management for server rooms.
Fire Suppression
Pre-action dry pipe and clean agent (Novec 1230) suppression for server halls.
Security & BMS
Mantraps, biometric access, CCTV, and building management system integration.
Scope Drifts
During execution of Backup Power, unforeseen site conditions were discovered that require additional engineering and remediation work not covered in the original scope.
Owner has requested additional Site & Civil scope beyond the original SOW. This was discussed during a recent progress meeting and would require a change order.
Architect specified upgraded materials for Building Shell that differ from the original SOW spec. This change increases material costs but was presented as a preference, not a requirement.
Recent building code update requires redesign of Raised Floor & Cabling. The new requirements were published after the original SOW was finalized.
Team proposed a value engineering option to reduce Cooling Systems costs by substituting equivalent materials and simplifying the installation approach.
Client requested that the Electrical – Utility & Switchgear phase be completed 2 weeks ahead of the original schedule. This would require overtime labor and expedited material deliveries.
Meetings
Paste or upload a transcript to analyze for scope drift
Upload an audio recording to transcribe and analyze
Record live audio and transcribe in real-time
Past Meetings
Budget Review Meeting
3/25/2026
Change Order Discussion
3/19/2026
Subcontractor Coordination
3/14/2026
RFI Review Session
3/11/2026
Owner/Architect/Contractor Meeting
3/6/2026
Weekly Progress Sync
3/1/2026