Harbor District Parking Garage
6-level precast concrete parking structure with 850 spaces, EV charging stations, and rooftop solar array.
Statement of Work
Harbor District Parking Garage - Statement of Work.pdf
application/pdf
Extracted Scope Items (6)
Foundations & Piling
Deep foundation system with driven piles due to proximity to waterfront.
Precast Structure
Precast double-tee beams, columns, and spandrels for 6-level garage.
MEP & Fire Protection
Ventilation, lighting, fire sprinklers, and electrical distribution.
EV Charging Infrastructure
Installation of 120 Level 2 chargers and 20 DC fast chargers with electrical backbone.
Rooftop Solar Array
500 kW solar canopy system on top deck with inverters and grid tie-in.
Wayfinding & Striping
Pavement markings, signage, pedestrian safety features, and access control gates.
Scope Drifts
Client requested that the MEP & Fire Protection phase be completed 2 weeks ahead of the original schedule. This would require overtime labor and expedited material deliveries.
During execution of EV Charging Infrastructure, unforeseen site conditions were discovered that require additional engineering and remediation work not covered in the original scope.
Owner has requested additional Foundations & Piling scope beyond the original SOW. This was discussed during a recent progress meeting and would require a change order.
Architect specified upgraded materials for Precast Structure that differ from the original SOW spec. This change increases material costs but was presented as a preference, not a requirement.
Meetings
Paste or upload a transcript to analyze for scope drift
Upload an audio recording to transcribe and analyze
Record live audio and transcribe in real-time
Past Meetings
Change Order Discussion
3/24/2026
Subcontractor Coordination
3/16/2026
RFI Review Session
3/12/2026
Owner/Architect/Contractor Meeting
3/6/2026
Weekly Progress Sync
3/2/2026