Summit Medical Office Build-Out
Interior build-out of a 40,000 SF medical office across two floors. Includes radiology suite with lead-lined walls.
Statement of Work
Summit Medical Office Build-Out - Statement of Work.pdf
application/pdf
Extracted Scope Items (6)
Framing & Drywall
Metal stud framing and drywall for exam rooms, offices, waiting areas, and corridors.
Radiology Suite
Lead-lined walls, specialized HVAC, and structural reinforcement for imaging equipment.
Plumbing & Medical Gas
Domestic water, waste, medical gas piping (O2, N2O, vacuum) throughout both floors.
HVAC
Dedicated AHUs with HEPA filtration for surgical and procedure rooms.
Electrical & Low-Voltage
Power distribution, nurse call system, access control, and structured cabling.
Finishes
Commercial-grade flooring, ceiling systems, millwork, and paint.
Scope Drifts
Owner has requested additional Framing & Drywall scope beyond the original SOW. This was discussed during a recent progress meeting and would require a change order.
Team proposed a value engineering option to reduce Electrical & Low-Voltage costs by substituting equivalent materials and simplifying the installation approach.
Recent building code update requires redesign of Finishes. The new requirements were published after the original SOW was finalized.
Architect specified upgraded materials for Radiology Suite that differ from the original SOW spec. This change increases material costs but was presented as a preference, not a requirement.
Client requested that the Plumbing & Medical Gas phase be completed 2 weeks ahead of the original schedule. This would require overtime labor and expedited material deliveries.
During execution of HVAC, unforeseen site conditions were discovered that require additional engineering and remediation work not covered in the original scope.
Meetings
Paste or upload a transcript to analyze for scope drift
Upload an audio recording to transcribe and analyze
Record live audio and transcribe in real-time
Past Meetings
Site Walk Debrief
3/25/2026
Budget Review Meeting
3/20/2026
Change Order Discussion
3/18/2026
Subcontractor Coordination
3/12/2026
RFI Review Session
3/8/2026
Owner/Architect/Contractor Meeting
3/4/2026
Weekly Progress Sync
3/2/2026